Design 2.0

Consulting and technical assistance

The technical assistance and consulting department provides added value to the activities performed by Leviatan Design.

These services contribute to improving the quality level of the projects that we handle.

Technical assistance involves a dedicated team of experts that ensure the flow of communication between the execution and design phase.

Consulting

Main attributions

  • Preliminary reports, global checks, structural proposals
  • Participating in the teams that prepare the feasibility studies for various investment projects
  • Optimising the technical solutions, preparing technical and economic reports
  • Running local checks, extensive design calculations

Technical Assistance

The technical assistance provided by the designer involves checking the way in which the building contractor performs the works; this is a way of (1) making sure that all instructions in the technical design are being followed, (2) adjusting or fine-tuning certain solutions if requested by the investor, and not lastly (3) designing technical solutions to fix the flaws that may appear during the execution phase, which is actually the last leg of the design process.

technical assistance

Main attributions

  • Site supervision and checking on the quality of the execution in the milestone report programme
  • Checking the amounts of materials that have been used and their correlation with the bills of quantities
  • Optimising the works schedule

Henri Coandă International Airport

The main objective of the project is the design of a new passenger terminal of approximately 176,000 sqm for Henri Coandă International Airport, developed in a...

  • CLIENT

    Bucharest Airports National Company

  • LOCATION

    Otopeni, Ilfov County

  • DESIGN STAGE

    In progress

View Project

New facilities for Borcea Air Base 86

This project will develop the facilities at Borcea Air Base 86 to ensure the smooth running of activities at the military base. The project includes the construction...

  • CLIENT

    Ministry Of National Defense

  • LOCATION

    Borcea, Călărași County

  • DESIGN STAGE

    In progress

  • EXECUTION STAGE

    In progress

View Project

Facilities for the Valea Poienii training ground

This project will develop the facilities at the Valea Poienii training ground in Argeș County, an essential objective for training forces specialized in CBRN (chemical, biological,...

  • CLIENT

    Ministry Of National Defense

  • LOCATION

    Valea Poienii, Argeș County

  • DESIGN STAGE

    In progress

  • EXECUTION STAGE

    In progress

View Project

OFF-BASE tanks for storing aviation fuel

The project includes the design and execution of two OFF-BASE tanks for storing aviation fuel, oil pipeline networks, water and sewage systems, as well as roads,...

  • CLIENT

    Ministry Of National Defense

  • LOCATION

    Borcea, Călărași County

  • DESIGN STAGE

    In progress

  • EXECUTION STAGE

    In progress

View Project

The Clinical Pneumology and Infectious Diseases Hospital of Brasov

The project includes the design and construction of the new Clinical Pneumology and Infectious Diseases Hospital of Brasov. The period allocated for design services is six...

  • CLIENT

    Brasov City Hall

  • LOCATION

    Brasov, Brasov County

  • DESIGN STAGE

    In progress

  • EXECUTION STAGE

    In progress

View Project

The new headquarters of ISU Vrancea and Focșani Fire Department

As part of this project, our company carried out the Feasibility Study and Technical Design and provided Technical Assistance for the demolition of the old administrative...

  • CLIENT

    IGSU - Romanian General Inspectorate for Emergency Situations

  • PLACEMENT

    Focșani, Vrancea County

  • STATUS

    Finalizat

View Project